| Home | My Account | Post Article | Upload Showcase | Site Shortcuts | Feedback | About us |

  Home > Consulting >

 
Seven Tech
Pat. Warn
Pat. Level2
Upgrade
Diagnosis
Consulting
Models
Prj cases
Model Sys
New L2
Modeling
Ind. Softw.
Simulation
Key Prjs
Li-Battery
Smart Equip
Model Prjs
Manufact.
Li Batt Ind.
Steel Ind.

Company

Defect Warn

Equip Intelli

Domain Sale

Training

- Class Time
- Classes
- Resources
- Lrn Method
- Status Need
- Metaverse
- Li Batt Tech
- Equip Softw.
- Intelli System
 

 
Metal Data Model Development Projects

II

Support on Level 2 Systems/Models/Logics

No

Name

Description

Client / Employer

18

Level 2 maintenance routine responsibilities

As a sole administrator to assume full responsibility for Level 2 systems. Guarantee the system is up and running for 24 hours per day; system examination and maintenance during the down day (usually once a week).

CSRM

19

Cascade Steel Level 1/Level 2 shop computer build and setup (hardware, middleware and operating system)

After the hardware technician prepared the basic PC hardware, it was connected to the shop computer. The work involved adding middleware (like PLC card), to configure resources (e.g. to make sure the PLC card don't have address conflict with others), and then to install Windows operating system, to setup an automatic logon, to install a touch screen driver, to configure the touch screen, and so on. The operators' computer skills were minimal, so, if anything was wrong, they only needed to reboot the HMI computer and everything should come up automatically.

CSRM

20

Cascade Steel Level 1 related software installation

After hardware and middleware installation and configuration, and windows installation and network configuration, Level 1 software was installed into the computer. This included the RSView application and RSLinks application, etc. In the later stage, OPC servers (e.g. Ingear) were used to replace RSLinks. Certain configuration may be needed or necessary. Then the Level 1 application was installed into the computer.

CSRM

21

Cascade Steel Level 2 system installation and setup

Based on the Level 2 design, the shop computer was required to have values of 28 topics through Windows registration, so that the information such as the Level 2 server for EAF, Level 2 server for LMF, as well as topic values for DDE, General, Grid, Logfile, Ping, Reports, Sockets, Grade-SpecFile, etc. would be provided.

CSRM

22

Cascade Steel shop computer maintenance and trouble shooting

Disk clones for every shop computer were made, so, if any computer was dead, only a few minutes were needed to rebuild it. In any pulpit, there were two HMI PCs. Company's pager was carried by system manager. The computer setup was done in this way: for any of the common problems, the computer would send a message to the Outlook server and the Outlook server would call the pager. Based on the phone number from which the pager was called, the type of the problem could roughly be identified.

CSRM


   
Project Categories (Notes)

     1.  Development on Level 2 Systems & Libraries/Packs
     2.  Support on Level 2 Systems/Models/Logics
     3.  Product properties improvement
     4.  Application development
     5.  Productivity Improvement
     6.  Design & Development
     7.  Process Modeling - Numerical
     8.  Process Modeling - Empirical
     9.  Shape and yield improvement
    10. Web and Web Resource
 

 