| 金通首页 | 我的帐户 | 发布文章 | 上传展示 | 网站捷径 | 反馈 | 关于我们 | 网站综述 |

 
  金通首页 > 中文版首页 > 模型 >

 
七大技术
专利预警
专利二级
升级规化
企业诊断
技术咨询
定制建模
项目案例
模型开发
二级系统
定制建模
工业软件
仿真模型
标杆项目
锂电制造
智能装备
模型开发
锂电行业
钢铁行业

公司指南

缺陷预警

装备智能

域名待售

技术培训

- 培训日程
- 课程总述
- 培训资源
- 学习方法
- 现状需求
-
- 锂电技术
- 装备智能
- 智能制造
 

 
Metal Pass 轧钢厂相关项目
 

IX

产品形状和成材率改进

编号

项目名称

项目介绍

客户

91

在后部道次调整弯辊和轧制力沿道次分布,降低钩形和镰刀弯,改善板型控制

Several C++ subroutine [子程序] that calculated the work roll [工作辊] bending [弯辊] [工作辊弯曲] for each pass [道次] were used to achieve slightly long centers. The bending [弯曲] subroutine [子程序] also calculated the adjustments [调整] of bending [弯曲] during the dynamic [动态] changes in the force [轧制力]. The level 1 approach to dynamic [动态] adjustments [调整] of bending [弯曲] during the pass [道次] was reviewed and corrected for problems of gain or response. Code to ramp the roll [轧辊] bending [弯辊] in level 1 on the head and tail to avoid reaching the upper [高端] limit of the roll [轧辊] bending [弯辊] and maintain [维护] good shape [形状] was also provided. The ramping of the roll [轧辊] bending [弯辊] for thermal changes in the crown [凸度] during the first 15 seconds of reversing pass [道次] was recommended [建议]. The centerline [中心线] gage [厚度] was often used to track the progress of the effect on the hook and camber [镰刀弯]. The operator [操作工] were trained to learn to setup and adjust the steering [手工调控] better.

Bethlehem, OSM, Ipsco, Nanjing, SMC

92

调整轧制力分布和弯辊以减少边侧波和中心波

This work used the same tools and adjustments [调整] described above in item 91. There were edge [边侧] and center wave [中心波浪] measuring tool [测量工具] that could be used to provide feedback [反馈] to operator [操作工] and the level 1 and 2.

Bethlehem, OSM, Ipsco, Nanjing

93

在后部道次降低向下勾头而导致的错过插槽,扭结,蛇头弯或其他缺陷。

Literature  [文献] reference [文献参考] on the effects of the differential speed [速度] between the top and bottom rolls [辊] were used to provide guidance on head end delta speed [速度]. The percentage differences in speed [速度] and the length of the sustained differences to avoid turn down [向下勾头] were recommended [建议]. Both positive and negative differences, depending on the thickness and the reduction [压下率] of the pass [道次], were recommended [建议]. The tools to measure [测量] the turn down [向下勾头] and ways to store and use the measurement [测量] to minimize the problem on specific products were recommended [建议].

OSM, Nanjing, Allegheny Ludlum

94

通过冷热矫直机设置以减少波浪和弓形

Models[模型] for retained strain [残余应变] after roll [轧辊]er leveling [辊式矫直] were used to set up the leveling. Gap setting [设定] to maximize flatness [平整度] without exceeding the limits of leveler were recommended [建议]. The level 1 and Level 2 [二级系统] software [软件] to perform the correct setting [设定] was tuned and adjusted.

Bethlehem, Nanjing

115

南钢中厚板轧机头和尾部的质量改进

This project is to reduce NISCO [南钢] plate [中板] mill head-end [头部] and tail-end [尾部] camber [镰刀弯]. When there is high error [误差] in the head-end [头部] or tail-end [尾部] force [轧制力] prediction [轧制力预报], the calculated initial [初始] roll [轧辊] gap [辊缝] will be inaccurate. AGC has to move in a big scope to adjust the roll [轧辊] gap [辊缝]. In this process, any weakness in the mill control and operation may trigger significant head-end [头部] and/or tail-end [尾部] defects [缺陷]. Therefore, the first attempt would be the force [轧制力] model [轧制力模型] Improvement [改进] in this aspect. In addition, based on the Parameter [参数] variation in the head-end [头部] and tail-end [尾部], thickness gradient [厚度梯度] will be created in the two ends, in order to achieve the equal thickness throughout the length. NISCO [南钢]^s Level 1 system [系统] from Siemens doesn^t have sufficient features for head-end [头部] and tail-end [尾部] to coordinate [坐标] with the Level 2 [二级系统], so both Level 1 and Level 2 [二级系统] should be improved.

Nanjing

 

    项目分类清单 (客户名注释)

     1.  二级系统开发
     2.  二级系统支持
     3.  力学性能改进
     4.  钢厂应用软件开发
     5.  产量的提高
     6.  轧制和道次规程开发
     7.  轧制过程模拟-数字法模拟
     8.  轧制过程模拟-经验公式模拟
     9.  产品形状和成材率改进
    10. 网路和网路资源

 

| 隐私权 | 条款及细则 | 关于我们 | 广告合作伙伴投资者赞助商列表 |  

版权所有:2022年金通有限责任公司